Server Room Design & Build
Power, cooling, cabling and protection in one coordinated build.
Explore service : Server Room Design & BuildChoose the scope of your IT move, from equipment transport to full de-commissioning and re-commissioning.
Enquire about this service
An IT move can range from transporting equipment to relocating an operating server room. The required scope depends on who will disconnect, pack, install and reconnect each system, and who is responsible for confirming it works at the destination.
EDISON offers packing and transport, de-racking and re-racking, and de-commissioning and re-commissioning. These services can form part of an office move, a server room relocation or a transfer into a data centre.
The scope should say where EDISON’s work starts and ends. Transporting a server and bringing its applications back into service are different tasks.
| Option | Work to include and confirm |
|---|---|
| Pack and transport | Equipment is packed in foam-lined flight cases, moved and handed over. Identify the items, collection and delivery points, building access and the person receiving them. Confirm separately who disconnects and reconnects the equipment. |
| De-rack and re-rack | Equipment is removed from its existing rack and installed to the agreed rack plan at the destination. Confirm cabinet positions, mounting arrangements and equipment placement. Cabling, system start-up and application checks need their own agreed scope. |
| De-commission and re-commission | The move includes cabling, re-patching and documentation as part of the agreed re-commissioning work. Define the shutdown order, destination connections, restart sequence and the checks used to accept the completed move. |
New racks, power, cooling, cabling and circuits should be ready for the equipment that will arrive. Confirm loading access, lift bookings and permitted work hours at both sites. The relocation window also needs to allow for the agreed reconnection and system checks.
Use an equipment inventory and rack plan to define the move. Identify application owners, shutdown permissions, current backup arrangements and a plan if a system cannot restart as expected. These decisions should be made before the transport date.
Share the equipment list, origin and destination, move window and required re-commissioning scope.