Global Data Centre Services

Host servers and network equipment in data centres across Hong Kong and mainland China.

Enquire about this service
Server drive bays with status lights in a rack

Rack space, connectivity and technical support.

Hosting equipment outside the office changes how it is powered, connected and accessed. Rack height is one part of the requirement; equipment depth, power demand, network connections and arrangements for technical assistance also matter.

EDISON provides data centre hosting solutions across Hong Kong and mainland China. The service brings together rack provision, connectivity, power infrastructure and technical support, with the location and configuration selected around your equipment and operating needs.

  • Standard 42U, 45U and 52U racks
  • Data centre internet with multiple international routing paths
  • High-speed DIA and IP transit to overseas networks
  • Data centre power infrastructure
  • 7×24 server, network and data centre technical support
  • 42U / 45U / 52U
  • DIA
  • IP transit

Hosting locations

Hong Kong · Shenzhen · Dongguan · Jiangmen · Huizhou · Guangzhou · Shanghai · Beijing

Data centre partners

  • iAdvantage
  • TGT IDC
  • China Telecom DC
  • China Unicom DC
  • HKBN DC
  • HKT DC

Specify the rack and everything around it.

The hosting enquiry should cover how the equipment will operate at the chosen site, as well as the space it occupies.

Rack size and equipment layout

Standard 42U, 45U and 52U racks are within the service scope. Confirm usable space, equipment depth, mounting arrangements, power requirements and space for growth. A rack inventory helps identify which servers, switches and other devices will need to be accommodated together.

Internet and site connections

Connectivity options include DIA, IP transit and internet access with multiple international routing paths. The appropriate arrangement depends on where traffic originates and which networks it needs to reach. Specify expected bandwidth, addressing requirements and connections back to your offices or other hosting locations.

Access and technical assistance

Data centre operations require clear arrangements for physical access and support. EDISON’s scope includes 7×24 server, network and data centre technical support. Agree which tasks are covered, how assistance is requested and which work remains with your internal team or equipment vendors.

Choose the location with operations in mind.

Consider the offices and users served by the equipment, the connections required and how maintenance visits will be handled. Space, power, connectivity and support arrangements need to be confirmed for the selected location.

If equipment is being moved from an office or another facility, include the relocation window and the point at which the new rack and circuits must be ready. Share an equipment inventory, power requirements, preferred city and target start date.

Looking for a hosting location?

Send your preferred city, equipment inventory, rack and power requirements, and connectivity needs.

Discuss your project